2019.8.1 (Thu) In the middle of Production

2019.8.1 (Thu) In the middle of Production

The production of the work is on-going.

After we drew a sketch, cut and adjusted the glass, and today we are filling the resin to join the glass. Resin is buried in two steps, front and back, considering strength and light transmission.

 

2019.08.01

Category:

< previous